![]()
Anzac Day Dreamworld Construction & Updates: Thrill Ride
April 25 2004
Page 1 of 2
- 1
- 2
The main pathway to Ocean Parade has been shut off as construction on the "2004 Teen Market Thrill Ride" commences.
Tiger Island has a new prop to better demonstrate the leaping behavior, which was formerly done between two logs to the right.
Gallery Navigation:
Page 1 of 2
- 1
- 2










